Why Choose ChromaGuard?

Directly addressing the three major roofing challenges in Hong Kong, one by one.

Technical Specifications

Tested against strict national standards for physical and chemical performance, guaranteeing ultimate protection

To ensure the waterproofing layer achieves optimal physical barrier and chemical weather resistance, the engineering team must strictly adhere to the following application protocols.

Application Guidelines

________________________________________________________________________________________________________________________________________________________

💡

📏

🔄

⏱️

🛠️

Theoretical Coverage

Application Tools

Recoat Interval

Touch Dry Time

1 - 1.5

m²/ kg / coat

Roller / Spray Gun / Brush

4-6 hours

2-4 hours

Pro Tip :

To achieve the optimal cooling effect, it is recommended to apply the coating before 10:00 AM or after 3:00 PM. Avoid application during high noon temperatures, as excessive heat can cause the film to form too quickly and negatively affect leveling.

* Recommended number of coats: 2-3 coats (3 coats recommended for internal and external corners).

As an engineer, understanding the physical and chemical mechanisms of materials is the key to ensuring project quality and architectural sustainability

The Science Behind the Application

an abstract photo of a curved building with a blue sky in the background

Ready to Get Started?

Access the complete technical documentation or contact our sales team.

Contact

Driving the Future with Technology,
Safeguarding the Earth with Expertise

Quick Links

Copyright © 2026 ReHarmony Limited. All rights reserved.