Why Choose ChromaGuard?
Directly addressing the three major roofing challenges in Hong Kong, one by one.
Technical Specifications
Tested against strict national standards for physical and chemical performance, guaranteeing ultimate protection
To ensure the waterproofing layer achieves optimal physical barrier and chemical weather resistance, the engineering team must strictly adhere to the following application protocols.
Application Guidelines
________________________________________________________________________________________________________________________________________________________
💡
📏
🔄
⏱️
🛠️
Theoretical Coverage
Application Tools
Recoat Interval
Touch Dry Time
1 - 1.5
m²/ kg / coat
Roller / Spray Gun / Brush
4-6 hours
2-4 hours
Pro Tip :
To achieve the optimal cooling effect, it is recommended to apply the coating before 10:00 AM or after 3:00 PM. Avoid application during high noon temperatures, as excessive heat can cause the film to form too quickly and negatively affect leveling.
* Recommended number of coats: 2-3 coats (3 coats recommended for internal and external corners).
As an engineer, understanding the physical and chemical mechanisms of materials is the key to ensuring project quality and architectural sustainability
The Science Behind the Application
Ready to Get Started?
Access the complete technical documentation or contact our sales team.
Contact
Driving the Future with Technology,
Safeguarding the Earth with Expertise
Email:contact@reharmonyhk.com
Quick Links
Copyright © 2026 ReHarmony Limited. All rights reserved.
